Torrent Power Project: Forest Clearance and Tribal Concerns
Torrent Power's hydropower project in Raigad involves 377 hectares and 32,000 trees. Learn its impact on ecology, tribal rights, and pumped-storage.
- GS 2: Social Justice
- GS-II Social Justice
- GS-III Environment and Ecology
- GS-III Economic Development
The Indian Express
15
mins Reading time
Add a comment

Join our WhatsApp Community
Why in the News?
Torrent Power's proposed 3,000-megawatt pumped-storage hydropower plant in Raigad district has led to the felling of nearly 1,100 trees, sparking protests over ecological and tribal concerns.
Key Highlights
The project requires 377 hectares, including forest and tribal land, and may involve clearing over 32,000 trees.
Environmental clearance was issued without recognising 150 Katkari families dependent on the forest for livelihoods.
The site lies in ESZ 1, where the Gadgil panel recommended no major infrastructure projects.
A study identified 26 Schedule I species
The project aims to reduce Maharashtra's 74.19% coal-based power dependency and integrate solar and wind energy.
Know the Basics
Pumped-storage hydropower: A system that stores energy by pumping water uphill during low demand and releasing it through turbines during peak demand.
Forest Rights Act, 2006: Recognises traditional forest land and produce rights; claims must be verified by the Gram Sabha.
Ecologically Sensitive Zones (ESZ): Areas classified for protection under the Gadgil panel, with restrictions on development based on sensitivity.
Detailed Analysis
Ecological Impact of Deforestation in the Western Ghats
Western Ghats forests contribute to rainfall in Tamil Nadu and the Cauvery basin through evapotranspiration, as per a 2018 IIT Bombay study.
Deforestation can degrade soil, reduce groundwater recharge, and increase surface temperatures by 0.25ยฐC.
Tribal Livelihoods and Forest Rights
Katkari families depend on forest produce like firewood, honey, and medicinal plants for daily earnings of โน150-200.
The Gram Sabha did not submit records of forest dependence, affecting compensation and rehabilitation eligibility.
Legal and Administrative Issues
The Forest Department began tree felling without a no-objection certificate from the Pali panchayat.
Environmental clearance requires a wildlife action plan to mitigate human-animal conflict, but implementation remains unclear.
Energy Benefits of Pumped-Storage Technology
The facility will store surplus electricity and integrate intermittent solar and wind power into the grid.
It could meet 10% of Maharashtra's demand and 75% of Mumbai's demand.
Significance for India
Balancing energy needs with ecological conservation is critical for sustainable development.
UPSC could test pumped-storage hydropower or the Forest Rights Act in Prelims or Mains.
Western Ghats deforestation impacts rainfall and agriculture beyond Maharashtra.
Tribals' exclusion raises ethical and governance questions under Social Justice.
Challenges
Environmental clearance ignored tribal dependence and ecological sensitivity of ESZ 1 areas.
Compensatory afforestation is planned far from the affected site, limiting its ecological benefits.
Public hearings did not result in formal claims, raising concerns about procedural transparency.
Way Forward
The Forest Department must ensure proper settlement of Forest Rights Act claims before land transfer.
MoEFCC should reassess ecological impacts and enforce Gadgil panel recommendations for ESZ 1 areas.
Torrent Power should engage with local communities for equitable compensation and rehabilitation.
State energy planning must prioritise renewable sources while minimising ecological damage.
PYQs (Prelims)
Question 1 of 3
Your Score: 0/3
Prelims Practice Quiz
Consider the following statements about Torrent Power's hydropower project:
How many of the above statements are correct?
- 1The project involves clearing 377 hectares of land, including 233 hectares of forest-department land.
- 2Environmental clearance requires compensatory afforestation within 10 km of the affected site.
- 3The project aims to reduce Maharashtra's dependence on coal-based power, which currently provides 74.19% of its electricity.
Frequently Asked Questions
Have questions about this article? Find answers to everything you need to know.
Q1
What is pumped-storage hydropower?
Pumped-storage hydropower stores energy by pumping water uphill during low demand and releasing it through turbines to generate electricity during peak demand.
What are Ecologically Sensitive Zones (ESZ)?
Ecologically Sensitive Zones (ESZ) are areas classified for environmental protection, with restrictions on development based on ecological sensitivity.
What does the Forest Rights Act, 2006, provide?
The Forest Rights Act, 2006, grants communities rights over forest land and produce traditionally used, with claims verified by the Gram Sabha.